Tacoma now allows two backyard homes on almost any residential lot. Whether one fits on yours depends on a dozen rules, your lot’s exact shape and where your house sits. This build applies the city’s rules to the county’s parcel map and draws the answer on the lot.
The rules for a detached backyard home (an ADU) are spread across a city web page, two zoning tip sheets and several code sections. None of them can tell a homeowner whether a unit fits on their lot, because that depends on geometry: the lot’s shape, the alley, the house’s footprint. Most people find out after paying a designer or waiting for a pre-application meeting.
A wrong early answer is expensive either way. A homeowner who is told “probably” pays for plans that don’t fit; one who is told “probably not” never applies.
It turns legal text into geometry, which is where “grounded” stops being a slogan: a setback either keeps a building five feet from the line or it doesn’t. It’s also local, public, and something I can check by walking down the street.
The ideaWrite the city’s rules down once as a small, cited rulebook. Let code apply them to each lot’s real shape. Hand every case the rules can’t settle to a person, with the exact question to ask.
Sources: City of Tacoma ADU standards (content current as of Aug 7, 2026); UR-1 and UR-2 District Development Standards tip sheets (TMC 13.06.020.F, 13.06.080.A); City of Tacoma Accela permit data, applications through .
For the city’s permitting staff, who answer “can I build an ADU here?” at the counter, by phone and in pre-application meetings. The share answered by rules is measured on the sample above.
Today, city planners pull up each parcel, measure it and read the code aloud to homeowners who mostly have the same question. Here is how that year shifts.
Measuring setbacks by hand for clear-cut lots goes away. Deciding which side of a corner lot is the front, reviewing critical areas and trees, and approving the permit stay with the city.
No planner has checked these drawings yet; that’s the next step, on 50 lots. The 2024 footprints miss anything built since. The rules don’t cover critical areas, easements, utilities, tree credits or fire separation, so every answer lists them as questions for the city. And corner lots are handed off rather than guessed, which is why so many lots need a person.